Delegation of the European Union to Armenia

Kramatorsk municipal electric transport power substation modernization

29/05/2015 - 00:00
Energy

The main expected results of the project implementation are the following: power consumption reduced for the public electric transport system's own needs by about 10% that will assist the general CO2 emmissions reduction; the electric public transport of Kramatorsk operational capacity is secured.

Description: The main expected results of the project implementation are the following: power consumption reduced for the public electric transport system's own needs by about 10% that will assist the general CO2 emmissions reduction; the electric public transport of Kramatorsk operational capacity is secured. The existing equipment has a high breakdown rate due to its high depreciation and long operational lifetime; a communication plan for dissemination of the Project implementation experience is developed and implemented.

Location: Kramatorsk, Ukraine

Implementing organisations: EXECUTIVE COMMITTEE OF KRAMATORSK CITY COUNCIL

Duration: from 05/2015 to 08/2017

EU Contribution: € 985.662,72